Projects

Sewer Infrastructure Development in Cairo Settlement, Tbilisi (2018)
To construct the sewer network in the Cairo settlement, a total of 9,300 linear meters of pipes of various diameters were installed.
Shindisi-Tabakhmela Sewer Collector Rehabilitation (2016)
Reforma Construction successfully implemented the replacement of an outdated sewer collector with a new pipeline of appropriate capacity.
Construction of Tunnel on Rike Territory in Tbilisi
Construction of underground Parking for 320 spaces on Europe Square, Tbilisi
Rehabilitation of Gulia Bridge in Tbilisi
The Gulia bridge was built in the 60s of the last century. For a long period of time, the bridge did not have any rehabilitation works, which is why it became urgent to carry out the restoration works of the damaged sections of the bridge and the water supply and sewerage on the bridge.
Construction of Parking for over 750 lots in Kobi/Gudauri Ski Resort
Rehabilitation of Underground Facilities (water, sewage, drainage) and Road Reconstruction on Agmashenebeli avenue, Tbilisi
Construction of Sewage Network and relevant Roads in Lilo Settlement
Reconstruction of Main Roads and Underground Facilities of Gldani District, Tbilisi (7km)
Reconstruction of Kostava Avenue, Tbilisi
In Tbilisi, on Kostava Street — from the Sports Palace to Saakadze Square — a new asphalt surface was laid, covering an area of 35,000 square meters.
Rehabilitation of Existing Tunnel on Svaneti Mountainous Road
Rehabilitation of Roads throughout Tbilisi
1 2 3 4