Sewer Infrastructure Development in Cairo Settlement, Tbilisi (2018)
To construct the sewer network in the Cairo settlement, a total of 9,300 linear meters of pipes of various diameters were installed. As part of the project, 33,000 m³ of soil was excavated and replaced, and 218 manholes were installed.