Rehabilitation of Dedaena Park, 9 March Park, Dry and Saarbrucken Bridges and the surrounding area in Tbilisi (2021)

Restoration and rehabilitation of the cultural heritage monument were carried out in Tbilisi's historical area. The project's scope included the rehabilitation of 29,000 square meters of territory. Over 50,000 saplings were planted, resulting in maximum green cover. The new park has been properly suited to the needs of disabled people. Over 180 commercial stands were installed. The irrigation system and fountain, which are operated by a remote-control system, have been built. An outdoor lighting network was set up, which can also be controlled remotely.
For the first time in the region, a multi-purpose concrete skatepark of International Standards was constructed. The skate park is equipped with an Olympic-standard lighting system, allowing it to host European international tournaments. 
 

The project included the rehabilitation of both the oldest Dry Bridge and the Saarbrucken Bridges. The bridges were decoratively illuminated.  
 

Dedaena Park and the surrounding area, transformed with a modern concept, is a recreational space equipped with modern amenities and provides holidaymakers a completely unique lifestyle.