Street Rehabilitation and Infrastructure Upgrade in Gldani District (2020)

As part of the rehabilitation project for I. Vekua, I. Khizanishvili, and Khochos Tba Streets in the Gldani district of Tbilisi, a new asphalt surface was laid over an area of 65,000 m². A stormwater drainage system was installed using pipes of various diameters, along with the construction of inspection and drainage manholes. The project also included the development of bicycle lanes and the construction of concrete retaining walls.