Rehabilitation works of the existing bridge over the Gldanula River in Tbilisi

The mentioned project provided for the rehabilitation works of the 546.5 m long bridge over the Gldanula river on the 9th (8+625) km of the Tbilisi entrance highway of international importance (S-9).

As part of the project, 5,985 m2 of asphalt pavement and 1,088 m of reinforced concrete pavement were arranged on the roadway. The existing railing was worked on and fully restored; 38 stands were reinforced with reinforced concrete.

Also, a waterproofing layer and a drainage system were installed on the entire section of the bridge. The coils of the bridge and the longitudinal seams of the monoliths were completely processed with shotcrete-concrete.