Rehabilitation of Zahesi–Osiauri Highway Section and Bridge Structure Completed (2023)
Rehabilitation works were carried out on km 5 to km 11.2 of the Zahesi–Mtskheta–Kavtiskhevi–Gori–Skra–Kareli–Osiauri (Sh-29) domestic highway, including the bridge structure over a ravine at km 6 (5+900). As part of the project, 51,151 square meters of asphalt surface were laid, and 4,132 linear meters of stormwater drainage channels were constructed.