Bridge over the Kvirila River, in the 3rd km of Zestaponi-Baghdati highway (2018)

Zestaponi-Baghdati bridge - design and construction of a 172.3-meter-long bridge. The construction of the bridge was taking place in the bed of the Kvrila River, under difficult meteorological and hydrological conditions. The volume of earthworks is ~19000 m3, the construction was carried out with ~1900 m3 monolithic and precast concrete constructions.